Services

Interior and exterior finishing services

Every service has its own page: what is included, styles and options, how the work runs, typical timelines and price guidance. Pick the one closest to your job; if it spans several, start with renovations and project management.

  1. Styled open-plan living room with a modern sofa, layered rugs and framed art, Nairobi

    Interior Design and Space Planning

    Most expensive mistakes in a Nairobi home happen before the work starts: a sofa that blocks the balcony door, a TV wall facing the afternoon sun, a kitchen island with no room to open the oven.

    • Timeline: 1 to 3 weeks for the design stage
    • Rooms: Living room, Bedroom, Office
  2. Styled console table with ceramics, vases and a mirror in a Nairobi apartment

    Home and Apartment Décor

    A decorated home is not the same as a renovated one.

    • Timeline: 1 to 2 weeks from approval
    • Rooms: Living room, Bedroom
  3. Finished office interior with glass partitions, desks and warm lighting, Nairobi

    Office and Commercial Interiors

    A commercial interior has a job to do.

    • Timeline: 3 to 8 weeks depending on size
    • Rooms: Office, Shop and restaurant
  4. Sage green and white fitted kitchen with timber splashback, Nairobi

    Kitchen and Bathroom Design

    Kitchens and bathrooms are the two rooms where design, plumbing, electrical and carpentry all meet, which is why they go wrong when handled by separate people.

    • Timeline: 3 to 6 weeks including fabrication
    • Rooms: Kitchen, Bathroom
  5. Classical wall panelling and feature wall with chandelier, Nairobi home

    Painting, Wallpaper and Decorative Finishes

    A paint job is only as good as the preparation underneath it.

    • Timeline: 2 to 6 days for a typical apartment
    • Rooms: Living room, Bedroom, Office, Shop and restaurant
  6. Layered gypsum ceiling with cove lighting over a dining space, Nairobi

    Ceiling Design and Lighting

    The ceiling is the part of a Nairobi room people notice without realising — a flat slab reads unfinished, while a framed tray with cove lighting makes the whole room feel deliberate.

    • Timeline: 1 to 3 weeks depending on the number of rooms
    • Rooms: Living room, Bedroom, Office, Shop and restaurant
  7. Fitted walk-in wardrobe with oak shelving and brass hardware, Nairobi

    Furniture Selection and Installation

    Furniture is where most décor budgets go, and where most regret comes from: a sofa too deep for the room, a wardrobe that does not reach the ceiling, a dining table that seats six only if nobody moves.

    • Timeline: 2 to 4 weeks for custom pieces
    • Rooms: Living room, Bedroom, Office
  8. Sheer linen curtains diffusing daylight in a finished living room

    Curtains, Blinds, Shutters and Accessories

    Window treatments do three jobs at once: privacy, light control and finishing the room.

    • Timeline: 7 to 10 days from measurement to fitting
    • Rooms: Living room, Bedroom, Office
  9. Jose Interior and Decor crew working on site during a renovation, Kenya

    Renovations and Project Management

    A renovation involves at least six trades: demolition, masonry, plumbing, electrical, carpentry and painting, plus tiling, ceilings and glazing on most jobs.

    • Timeline: 4 to 16 weeks depending on scope
    • Rooms: Living room, Bedroom, Kitchen, Bathroom, Office, Shop and restaurant
  10. Black display shelving and media wall with oak bench in a Nairobi living room

    TV Unit Design and Installation

    A TV on a bare wall with cables showing makes even a good room feel temporary.

    • Timeline: 1 to 3 weeks including fabrication
    • Rooms: Living room
  11. Walk-in wardrobe with oak shelving, drawers and LED strip lighting, Nairobi

    Wardrobe Design and Installation

    A wardrobe that reaches the ceiling can hold twice what a shop-bought one does, and it does not gather dust on top.

    • Timeline: 1 to 2 weeks including fabrication
    • Rooms: Bedroom
  12. Panelled doors and fitted joinery along a Nairobi apartment corridor

    Door Installation and Repairs

    A door that drags on the carpet, will not latch or swells in the rains is a small problem that gets annoying daily.

    • Timeline: Same day to one week depending on the door
    • Rooms:
  13. Warm wooden floor being fitted in a Nairobi living room

    Wooden Flooring

    Flooring decides how a room feels underfoot before any furniture goes in.

    • Timeline: One to two days per room
    • Rooms: Living room, Bedroom
  14. Panelled ceiling with recessed sections and spotlights in a Nairobi interior

    PVC Ceiling Installation

    PVC ceilings are the practical choice where moisture, speed or budget rules out gypsum — kitchens, bathrooms, shops, salons and rental units.

    • Timeline: One to two days per room
    • Rooms: Kitchen, Bathroom
  15. Basin mixer tap and new plumbing fittings on a bathroom vanity, Nairobi

    Plumbing Services

    Plumbing problems rarely stay small — a dripping tap becomes stained joinery, a slow drain becomes a flood.

    • Timeline: Same day for most repairs
    • Rooms: Kitchen, Bathroom
  16. Tray ceiling with spotlights and pendant installed by a licensed electrician, Nairobi

    Electrical Repairs and Installation

    Sockets that spark, dimmers that flicker and lighting that never quite works right usually trace back to one thing: electrical work done last instead of first.

    • Timeline: Same day for most repairs
    • Rooms: Living room, Bedroom, Kitchen
  17. Glass-partitioned dressing area with dark framed panels in a Nairobi interior

    Wall Partitioning and Interior Decoration

    Open space only works if it is divided well.

    • Timeline: Three days to two weeks depending on size
    • Rooms: Office, Shop and restaurant
  18. New metal roofing on compact modern homes in Kenya

    Roofing Services

    A leaking roof ruins everything the interior team just finished — ceilings stain, paint bubbles, floors swell.

    • Timeline: One day for repairs; three to seven days for re-roofing
    • Rooms:
  19. Fitted kitchen cabinets with island and pendant lighting, Nairobi

    Kitchen Cabinets

    Not every kitchen needs gutting — often the layout and plumbing are fine and only the cabinets are tired.

    • Timeline: About a week of fabrication plus one to three days on site
    • Rooms: Kitchen

Not sure which service you need?

Describe the space and the problem; we will tell you what it involves and roughly what it costs.