Services
Interior and exterior finishing services
Every service has its own page: what is included, styles and options, how the work runs, typical timelines and price guidance. Pick the one closest to your job; if it spans several, start with renovations and project management.
-

Interior Design and Space Planning
Most expensive mistakes in a Nairobi home happen before the work starts: a sofa that blocks the balcony door, a TV wall facing the afternoon sun, a kitchen island with no room to open the oven.
- Timeline: 1 to 3 weeks for the design stage
- Rooms: Living room, Bedroom, Office
-

Home and Apartment Décor
A decorated home is not the same as a renovated one.
- Timeline: 1 to 2 weeks from approval
- Rooms: Living room, Bedroom
-

Office and Commercial Interiors
A commercial interior has a job to do.
- Timeline: 3 to 8 weeks depending on size
- Rooms: Office, Shop and restaurant
-

Kitchen and Bathroom Design
Kitchens and bathrooms are the two rooms where design, plumbing, electrical and carpentry all meet, which is why they go wrong when handled by separate people.
- Timeline: 3 to 6 weeks including fabrication
- Rooms: Kitchen, Bathroom
-

Painting, Wallpaper and Decorative Finishes
A paint job is only as good as the preparation underneath it.
- Timeline: 2 to 6 days for a typical apartment
- Rooms: Living room, Bedroom, Office, Shop and restaurant
-

Ceiling Design and Lighting
The ceiling is the part of a Nairobi room people notice without realising — a flat slab reads unfinished, while a framed tray with cove lighting makes the whole room feel deliberate.
- Timeline: 1 to 3 weeks depending on the number of rooms
- Rooms: Living room, Bedroom, Office, Shop and restaurant
-

Furniture Selection and Installation
Furniture is where most décor budgets go, and where most regret comes from: a sofa too deep for the room, a wardrobe that does not reach the ceiling, a dining table that seats six only if nobody moves.
- Timeline: 2 to 4 weeks for custom pieces
- Rooms: Living room, Bedroom, Office
-

Curtains, Blinds, Shutters and Accessories
Window treatments do three jobs at once: privacy, light control and finishing the room.
- Timeline: 7 to 10 days from measurement to fitting
- Rooms: Living room, Bedroom, Office
-

Renovations and Project Management
A renovation involves at least six trades: demolition, masonry, plumbing, electrical, carpentry and painting, plus tiling, ceilings and glazing on most jobs.
- Timeline: 4 to 16 weeks depending on scope
- Rooms: Living room, Bedroom, Kitchen, Bathroom, Office, Shop and restaurant
-

TV Unit Design and Installation
A TV on a bare wall with cables showing makes even a good room feel temporary.
- Timeline: 1 to 3 weeks including fabrication
- Rooms: Living room
-

Wardrobe Design and Installation
A wardrobe that reaches the ceiling can hold twice what a shop-bought one does, and it does not gather dust on top.
- Timeline: 1 to 2 weeks including fabrication
- Rooms: Bedroom
-

Door Installation and Repairs
A door that drags on the carpet, will not latch or swells in the rains is a small problem that gets annoying daily.
- Timeline: Same day to one week depending on the door
- Rooms:
-

Wooden Flooring
Flooring decides how a room feels underfoot before any furniture goes in.
- Timeline: One to two days per room
- Rooms: Living room, Bedroom
-

PVC Ceiling Installation
PVC ceilings are the practical choice where moisture, speed or budget rules out gypsum — kitchens, bathrooms, shops, salons and rental units.
- Timeline: One to two days per room
- Rooms: Kitchen, Bathroom
-

Plumbing Services
Plumbing problems rarely stay small — a dripping tap becomes stained joinery, a slow drain becomes a flood.
- Timeline: Same day for most repairs
- Rooms: Kitchen, Bathroom
-

Electrical Repairs and Installation
Sockets that spark, dimmers that flicker and lighting that never quite works right usually trace back to one thing: electrical work done last instead of first.
- Timeline: Same day for most repairs
- Rooms: Living room, Bedroom, Kitchen
-

Wall Partitioning and Interior Decoration
Open space only works if it is divided well.
- Timeline: Three days to two weeks depending on size
- Rooms: Office, Shop and restaurant
-

Roofing Services
A leaking roof ruins everything the interior team just finished — ceilings stain, paint bubbles, floors swell.
- Timeline: One day for repairs; three to seven days for re-roofing
- Rooms:
-

Kitchen Cabinets
Not every kitchen needs gutting — often the layout and plumbing are fine and only the cabinets are tired.
- Timeline: About a week of fabrication plus one to three days on site
- Rooms: Kitchen
Not sure which service you need?
Describe the space and the problem; we will tell you what it involves and roughly what it costs.
